Know what is on site before you plan
A good project starts with accurate information. Our engineers visit, record what is there and report back with photos and clear notes, so your team can plan rollouts and migrations without guesswork.
What is included
- Pre-installation site walkthroughs
- Comms room and rack audits
- Asset inventories with serial numbers
- Power, space and cabling checks
- Photo reports and floor notes
- Recommendations for your project
Typical jobs
A few of the requests we handle most often. If yours is not listed, ask anyway.
Pre-rollout survey
Check space, power, cabling and access before equipment is shipped.
Rack ID survey
Build a rack register with every device, label and serial number.
Comms room audit
Record the current state and flag risks such as cooling or cabling.
Asset inventory
Count and tag devices across a site or a whole estate.
Wi-Fi walkthrough
Note access point locations, mounting and cabling needs.
Due diligence visit
Document the IT at a site you are taking over.

Why teams book us
- Reports your team can act on straight away
- Consistent surveys across many sites
- Findings that feed directly into your quote